
SpaceX has proposed plans for a massive, 747-acre supercomputing and AI data center project in Cochise County, Arizona. The $50-billion development, located about 60 miles southwest of Tucson along Highway 191, would create thousands of jobs and bring in millions in tax revenues.
The total development would be built in four phases and would consist of nine 493,000-square foot structures for a total of over 4.4 million square feet, once completed. It would be developed by Tombstone Resources LLC, a SpaceX entity. The six-gigawatt development, once fully built out, would be one of the largest data center campuses in the United States.
The project would feature a massive 24-gigawatt-hour Battery Energy Storage System (BESS) alongside outdoor transformer and cooling yards. The supercomputers will be operated solely by SpaceX and its affiliates for AI training, engineering, and national security workloads, with no public or retail colocation.
Construction of the center would bring roughly 5,000 construction jobs to the area, with the completed project expected to provide about 1,000 permanent positions. The development would likely generate up to $100 million in annual property tax revenue, per industry sources.
The post SpaceX Proposes 747-Acre Data Center Project in Arizona appeared first on Connect CRE.
​Â